- A full house came down with an occupied neighbor a few feet away and nothing but a strip of grass between them.
- A fence went up along the property line first, the house came down top down, and every piece stayed on its own footprint.
- Tight lot teardowns are regular work for us. Call or text (609) 290-3565 for a free estimate.
The Fence Line Goes Up First
Before the machine touched anything, a construction fence went in along the strip of grass between this house and the one next door. That fence is the whole plan in one line: everything on the far side, the neighbor's lawn, siding, and walkway, is not part of the job.
On a lot like this the neighbor is not an abstraction. The gray house on the left is occupied, a few feet from the work, and the people inside are going to watch every minute of it. The fence gives the crew a boundary to work to and gives the neighbor something visible that says the job ends here.
Roof First, Walls In
The house came down from the top. Roof first, then the upper walls, with every piece pulled inward toward the middle of the lot. Push a wall over on a site like this and you have handed control to gravity, a few feet from someone's siding.
Working top down is slower to watch. It is also the reason the gray house on the left finished the day looking exactly the way it started.
Working The Pile On The Footprint
Everything that came down stayed on the home's own footprint, where the machine could reach it for loading and where none of it could drift toward the fence. From there the job turns into sorting: framing lumber one way, broken concrete and masonry another.
You can see pieces of the old slab already broken up in the foreground. On a full teardown that comes out too. A lot with concrete left in the ground is not finished, and the next builder is the one who finds out.